Local Vendor Program

Wind farm construction is a very specialized process, but it requires common products and services, many of which can be found locally. The typical construction duration for a wind farm is approximately nine months from the start of construction to the commercial operation date. The work consists of upgrading and building new stone roads, forming and pouring large concrete foundations, installing underground electrical systems and overhead high voltage transmission lines, constructing a project specific substation, erecting the wind turbine tower and generator, and completing the mechanical and electrical connections. In addition, there are other general or community needs.

To learn more about the types of services that are needed to support wind farm construction, visit our Building a Wind Farm page.

Below is a list of descriptions for the types of services that will be needed to construct the Lincoln Land Wind project. To learn more about our Local Vendor Program or to sign up, please visit our Local Vendor Signup page here.

 

LOCAL VENDOR DIRECTORY 

 

Freesen/Illinois Valley Paving
A Division of United Contractors Midwest Inc.
Rich Mander
(217) 836-3385 (m)
[email protected]

Jess Electric
Scott Jess
(217) 371-1336 (m)
[email protected]

Metro Consulting Associates, LLC
Mike Schultz, Director
(313) 600-6567 (m)
[email protected]

Napa Auto Parts
Mike Bourn
(217) 883-2819 (m)
[email protected]

Tom Finch Automotive
Tom Finch
(217) 245-4778 (m)
[email protected]

Western Asphalt. Inc
Brenda Welch
(271) 320-3200 (m)
[email protected]

Sutton Trucking
Todd Sutton
(217) 577-4911 (m)
[email protected]

Buena Vista Farms, Inc
Teri Gutierrez
(217) 243-3290 (m)
[email protected]

Hamilton's Catering Service, Inc
George Hamilton
(217) 473-8523 (m)
[email protected]

Ayers Mansion II
Jethro DeWolf
[email protected]
https://www.airbnb.com/rooms/28468047?source_impression_id=p3_1565035051_R5JrTSITMayQw1lg